Construction & Project Delivery

Expert oversight ensures your processing facility is built right the first time. Our construction management services protect your investment, maintain schedules, and deliver facilities that exceed operational expectations.
Construction Management Excellence
Pre-Construction
Set your project up for success with thorough planning and preparation before breaking ground.
- • Constructability reviews
- • Value engineering
- • Contractor selection
- • Permit coordination
- • Budget refinement
- • Schedule development
Construction Phase
Active oversight during construction ensures quality, safety, and adherence to design intent.
- • Daily site supervision
- • Quality control inspections
- • Progress monitoring
- • Change order management
- • Safety compliance
- • Issue resolution
Project Closeout
Ensure smooth transition to operations with comprehensive commissioning and documentation.
- • Systems commissioning
- • Punch list management
- • As-built documentation
- • Training coordination
- • Warranty tracking
- • Performance testing
Project Delivery Methods
We help select and implement the optimal project delivery method based on your specific needs, timeline, and risk tolerance.
Design-Bid-Build
Traditional approach with sequential design and construction phases, offering maximum owner control and competitive bidding.
Advantages:
- • Competitive pricing through open bidding
- • Complete design before construction
- • Clear contractual relationships
Best For:
- • Well-defined project scope
- • Public sector requirements
- • Cost-sensitive projects
Design-Build
Single-source responsibility for design and construction, enabling faster delivery and integrated project execution.
Advantages:
- • Accelerated project schedule
- • Single point of responsibility
- • Early cost certainty
Best For:
- • Fast-track projects
- • Complex technical requirements
- • Experienced owners
Construction Management
Professional construction manager acts as owner's agent, providing expertise while maintaining owner control over contracts.
Advantages:
- • Professional expertise throughout
- • Flexibility in contractor selection
- • Real-time cost transparency
Best For:
- • Phased construction projects
- • Owners wanting involvement
- • Complex multi-prime projects
Integrated Project Delivery
Collaborative approach aligning owner, designer, and builder interests through shared risk and reward structures.
Advantages:
- • Aligned team incentives
- • Enhanced collaboration
- • Reduced conflicts and claims
Best For:
- • Large, complex projects
- • Innovation-focused facilities
- • Relationship-based teams
Construction Excellence Focus
Food Safety by Design
Sanitary Construction
Ensure all construction details support cleanability and prevent harborage points for contamination.
Material Selection
Specify appropriate materials for food contact and wet environments that meet regulatory requirements.
Drainage Systems
Design and install proper slopes and drainage to prevent standing water and facilitate cleaning.
Environmental Controls
Implement HVAC and refrigeration systems that maintain product quality and prevent condensation.
Halal Facility Requirements
Segregation Infrastructure
Build physical separations and dedicated systems for halal production lines and storage areas.
Prayer Facilities
Include appropriate spaces for Muslim employees to perform daily prayers with proper ablution areas.
Slaughter Area Design
Configure slaughter areas for proper orientation, blessing stations, and hand slaughter operations.
Certification Support
Accommodate halal certifier requirements for offices, observation areas, and documentation systems.
Risk Mitigation Strategies
Our proactive approach identifies and mitigates risks before they impact your project timeline or budget.
Schedule Risks
- • Weather contingencies
- • Long-lead item tracking
- • Critical path monitoring
- • Resource planning
Cost Risks
- • Change order control
- • Value engineering
- • Contingency management
- • Market escalation
Quality Risks
- • Inspection protocols
- • Material testing
- • Workmanship standards
- • Documentation control
Modern Construction Technology
Leverage cutting-edge tools and techniques to enhance project visibility, coordination, and outcomes.
BIM Coordination
Building Information Modeling detects clashes before construction, saving time and reducing field conflicts between trades.
Digital Progress Tracking
Cloud-based platforms provide real-time visibility into project status, enabling proactive decision-making and issue resolution.
Drone Documentation
Regular aerial photography and video capture construction progress and provide valuable documentation for stakeholders.
Mobile QA/QC
Field teams use mobile devices to complete inspections, capture issues, and track resolution in real-time.
Proven Project Results
On-Time Completion
Within Budget
Safety Incidents
Client Satisfaction
Why Clients Choose Our Construction Management
- ✓Deep understanding of food processing requirements
- ✓Proven track record in halal facility construction
- ✓Strong relationships with specialized contractors
- ✓Technology-forward project management approach
- ✓Transparent communication and reporting
- ✓Focus on operational readiness from day one
Build with Confidence
From groundbreaking to grand opening, our construction management expertise ensures your processing facility is delivered on time, on budget, and ready to exceed operational expectations.